Minemax Scheduler
Strategic mine schedule optimisation that simultaneously optimises all aspects of the mine plan in a single run.
About Minemax Scheduler
Minemax Scheduler is the flagship product for strategic mine schedule optimisation. It simultaneously optimises mine schedule, trucking, waste dump sequencing, cut-off and cut-over grades, material destinations, blending, processing, and capital expenditure in a single optimisation run using IBM CPLEX technology.
This simultaneous multi-constraint approach differentiates it from tools that optimise individual components sequentially. Version 7.8 added enhanced CAPEX modelling, vertical rate of advance constraints, and fastest-path haulage distance calculations. Scheduler is positioned as an optimisation-based strategic scheduling tool at mid-to-large mining operations worldwide.
Reviews & Ratings
Minemax Schedulerhasn't been rated across our 10 dimensions yet.