Minemax Scheduler
Strategic mine schedule optimisation that simultaneously optimises all aspects of the mine plan in a single run.
Write a Review →About Minemax Scheduler
Minemax Scheduler is the flagship product for strategic mine schedule optimisation. It simultaneously optimises mine schedule, trucking, waste dump sequencing, cut-off and cut-over grades, material destinations, blending, processing, and capital expenditure in a single optimisation run using IBM CPLEX technology.
This simultaneous multi-constraint approach differentiates it from tools that optimise individual components sequentially. Version 7.8 added enhanced CAPEX modelling, vertical rate of advance constraints, and fastest-path haulage distance calculations. Scheduler is positioned as an optimisation-based strategic scheduling tool at mid-to-large mining operations worldwide.
Reviews & Ratings
No community reviews yet
Share what Minemax Scheduler is like on a real mining operation. Your review helps other teams evaluate the product without vendor spin.
Every review covers
- Ease of Use
- Implementation & Onboarding
- Customer Support & Responsiveness
- Value for Money
- Reliability / Uptime
- Integration with Other Systems
- Reporting & Data Output
- Training & Documentation
- Suitability for Purpose
- Mobile / Field Usability
Profile facts
- Primary category
- Mine Planning & Design
- Vendor
- Minemax
- Listing status
- Not yet claimed by the vendorIs this your product? Claim this listing
- Profile last updated
- 19 Feb 2026
Other products from this vendor
Questions to ask this vendor
- Can your scheduling algorithm incorporate complex, multi-element blending constraints to ensure the mill receives a consistent feed?
- If the geological block model is updated, how much manual rework is required to update the existing stope or pit designs?
- What optimisation algorithms do you use for pit limit analysis, and how do they scale with block models containing hundreds of millions of blocks?
- Which planning horizons does your mine scheduling software cover, from life of mine to the shift plan, and how does a plan pass between them?
This profile is written from the vendor's own material. MSR has not tested Minemax Scheduler, and there are no community reviews yet.