GEOVIA Whittle
Strategic open-pit mine optimisation software for maximising Net Present Value.
Write a Review →About GEOVIA Whittle
GEOVIA Whittle is a benchmark tool for strategic open-pit mine planning. It evaluates the financial viability of mineral deposits and determines optimal extraction strategies through pit shell generation using Lerchs-Grossmann or Pseudoflow algorithms. Whittle provides end-to-end open-pit optimisation including strategic scheduling, cost and price modelling, blending optimisation, cut-off optimisation, and simultaneous stockpile optimisation.
Whittle is deeply embedded in feasibility study workflows globally and remains the reference standard in the category. Newer tools including MiningMath and Minemax Planner challenge its approach with alternative single-step and MILP-based optimisation methods. Whittle integrates with GEOVIA Surpac and MineSched within the GEOVIA product ecosystem.
Reviews & Ratings
No community reviews yet
Share what GEOVIA Whittle is like on a real mining operation. Your review helps other teams evaluate the product without vendor spin.
Every review covers
- Ease of Use
- Implementation & Onboarding
- Customer Support & Responsiveness
- Value for Money
- Reliability / Uptime
- Integration with Other Systems
- Reporting & Data Output
- Training & Documentation
- Suitability for Purpose
- Mobile / Field Usability
Profile facts
- Primary category
- Mine Planning & Design
- Vendor
- GEOVIA
- Listing status
- Not yet claimed by the vendorIs this your product? Claim this listing
- Profile last updated
- 19 Feb 2026
Other products from this vendor
Questions to ask this vendor
- Can your scheduling algorithm incorporate complex, multi-element blending constraints to ensure the mill receives a consistent feed?
- If the geological block model is updated, how much manual rework is required to update the existing stope or pit designs?
- What optimisation algorithms do you use for pit limit analysis, and how do they scale with block models containing hundreds of millions of blocks?
- Which planning horizons does your mine scheduling software cover, from life of mine to the shift plan, and how does a plan pass between them?
This profile is written from the vendor's own material. MSR has not tested GEOVIA Whittle, and there are no community reviews yet.
What customers have said publicly
Pit optimization was done using Geovia's WhittleTM software (version 4.7) to define pit limits with input for economic and slope parameters. The optimization used parameters provided by Vista and their consultants based on current and previous studies.
Thomas L. Dyer, P.E.
Tetra Tech, for Vista Gold Corp., Mt Todd Gold Project
· Source: Vista Gold technical report
All your designs start in Whittle. You cannot work in the open pit environments without a tool like Whittle – you can't live without it.
Stephane Frechette
Engineering Assistant Superintendent, Agnico Eagle Meadowbank
· Source: GEOVIA
Quoted from public sources. Not an MSR verified review.